Chester County
Engineering/Design Firm: HNTB
Replace existing wood poles supporting the overhead traction power contact system with new steel catenary structures. The existing wood poles are reaching the end of their useful life and failures have occurred. Frazer Yard, including the wood poles, originally built in 1988 as a temporary facility.
General Contractor | Vanalt Electric Construction Inc.
$3,201,891